top of page

Hangangsoo Hospital

Type : Medical

Design Period : 2024.01 ~ 2024.06  

Construction Period : 2024.06 ~ On Going

Site : 83 Yeongdeungpo-Ro, Yeongdeungpo-Gu, Seoul

Site Area : 1,031.00m²

Site Coverage Area : 573.65㎡

Building-to-Land Area : 55.64% (MAX 60%)

Total Floor Area : 4,612.53㎡ 

Floor Area Ratio : 396.06% (MAX 400%)

Building Scope : B1 - 9F

Building Height : 43.25m

Structure : Steal Frame(Part of Extension)

              Concrete Frame(Part of Origin)

Exterior Finish : Aluminum Sheet Panel

Lightning : 폼기버

Structure : 씨엔피동양

Civil ENG : 다온지오이엔지

Mechanical : 하나기연

Electric : 천일엠이씨

Construction : JKS건설

bottom of page