Hangangsoo Hospital
Type : Medical
Design Period : 2024.01 ~ 2024.06
Construction Period : 2024.06 ~ On Going
Site : 83 Yeongdeungpo-Ro, Yeongdeungpo-Gu, Seoul
Site Area : 1,031.00m²
Site Coverage Area : 573.65㎡
Building-to-Land Area : 55.64% (MAX 60%)
Total Floor Area : 4,612.53㎡
Floor Area Ratio : 396.06% (MAX 400%)
Building Scope : B1 - 9F
Building Height : 43.25m
Structure : Steal Frame(Part of Extension)
Concrete Frame(Part of Origin)
Exterior Finish : Aluminum Sheet Panel
Lightning : 폼기버
Structure : 씨엔피동양
Civil ENG : 다온지오이엔지
Mechanical : 하나기연
Electric : 천일엠이씨
Construction : JKS건설